Elk River Wind Project

Coordinates: 37°39′29″N 96°31′58″W / 37.658079°N 96.532793°W / 37.658079; -96.532793
From Wikipedia, the free encyclopedia

The Elk River Wind Project is a 150 megawatt wind farm near Beaumont in Butler County, Kansas. The Elk River Project subsidiary is owned by PPM Energy and the project has been operating since 2005.[1]

Empire District Electric selected Elk River, and signed a twenty-year agreement with PPM Energy to purchase wind energy from the farm.[2]

See also[edit]

References[edit]

  1. ^ Kansas Wind Projects - Elk River Wind Project
  2. ^ "Elk River Wind Project". Archived from the original on 2008-07-24. Retrieved 2008-08-31.

External links[edit]

37°39′29″N 96°31′58″W / 37.658079°N 96.532793°W / 37.658079; -96.532793