Yelahanka metro station

Coordinates: 13°06′08″N 77°36′01″E / 13.10210°N 77.60035°E / 13.10210; 77.60035
From Wikipedia, the free encyclopedia

Yelahanka
Namma Metro station
General information
LocationYelahanka, Bengaluru, Karnataka, 560064
Coordinates13°06′08″N 77°36′01″E / 13.10210°N 77.60035°E / 13.10210; 77.60035
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsSide platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsMainline rail interchange Yelahanka Junction
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2026; 2 years' time (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Jakkur Cross Blue Line
(Future Service and skipping Jakkur Plantation)
Bagalur Cross
Location
Map

Yelahanka is an upcoming important elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station will serve the main Yelahanka suburban area, which contains Yelahanka Junction, along with its Rail Wheel Factory, Yelahanka Lake and Yelahanka Air Force Station. It also includes many residential areas such as SOBHA Palm Court Apartments, Park View Apartments and SLV Nest Apartments.

This station will be useful for general public who plan to head towards Hebbal in the south and towards Kempegowda International Airport in the north. This metro station is slated to be operational around June 2026.[2][3][4][5]

Station layout[edit]

Station Layout - To Be Confirmed

Yelahanka track layout (TBC)
P#
P#
Station with two tracks and two side platforms
**Skipping Jakkur Plantation
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Krishnarajapura / Central Silk Board next station is Jakkur Cross (Skipping Jakkur Plantation)
Platform #
Northbound
Towards ← KIAL Terminals next station is Bagalur Cross
Side platform | Doors will open on the left Disabled access
L2

Connections[edit]

Entry/Exit[edit]

See also[edit]

References[edit]

  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.

External links[edit]