Plambeck Bulgarian Wind Farm

From Wikipedia, the free encyclopedia
Plambeck Bulgarian Wind Farm
Country
StatusProposed
Power generation
Units operationalup to 125
Nameplate capacityup to 250 MW

The German wind farm developer Plambeck Neue Energien founded a Bulgarian joint venture in 2008. This joint venture actually develops several wind farm projects. The medium-term target is to find wind farm sites with a capacity for wind turbines with a nominal output of together up to 250 MW with a capital investment required of up to US$450 million.

See also[edit]

References[edit]