Lomaum Dam

Coordinates: 12°43′32″S 14°23′09″E / 12.72555°S 14.38576°E / -12.72555; 14.38576
From Wikipedia, the free encyclopedia
Lomaum Dam
CountryAngola
Construction began1965
Demolition date1983
Power Station
Annual generation20 MW

Lamaum Dam is a privately owned hydroelectric dam located on the Catumbela River in the Benguela province of central Angola. Initially completed in 1965, the dam played a crucial role in supplying electricity to the towns of supplying electricity to the towns of Lobito, Benguela and Huambo.[1], with an initial power output of 20 megawatts (27,000 hp).

Destruction and Rehabilitation (1983–1987): In 1983, Lamaum Dam suffered severe damage when it was destroyed by UNITA(National Union for the Total Independence of Angola) after Angola gained independence.[2] This destructive act led to widespread flooding, resulting in the tragic loss of ten lives. Recognizing the importance of this infrastructure, Portugal stepped in to provide credit for the rehabilitation of the dam in 1987.

Rehabilitation and Expansion Plans (2008–2011): In 2008, plans were set in motion for the rehabilitation and enlargement of Lamaum Dam to increase its capacity to 60 megawatts (80,000 hp). The anticipated completion date was targeted for 2011.[3] However, the actual progress and completion of the project may have been subject to various factors, including funding, technical challenges, and other logistical considerations.

See also[edit]

References[edit]

  1. ^ "Portuguese Aid for Lomaum Dam". Modern Power Systems. 9. Miller Freeman Publications: 13. 1989.
  2. ^ Africa South of the Sahara 2004. Regional surveys of the world (33rd ed.). Psychology Press. 2003. p. 52. ISBN 1-85743-183-9.
  3. ^ "Angola: Power Production Encourages Investments in Industry". All Africa. July 22, 2010. Retrieved 2011-04-05.

12°43′32″S 14°23′09″E / 12.72555°S 14.38576°E / -12.72555; 14.38576