Kundalahalli metro station

Coordinates: 12°58′39″N 77°42′57″E / 12.977461°N 77.715761°E / 12.977461; 77.715761
From Wikipedia, the free encyclopedia

Kundalahalli
Namma Metro station
Kundalahalli metro station
General information
LocationEPIP Zone, Brookefield Bengaluru, Karnataka 560066
Coordinates12°58′39″N 77°42′57″E / 12.977461°N 77.715761°E / 12.977461; 77.715761
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Purple Line
PlatformsSide platform
Platform-1 → Whitefield (Kadugodi)
Platform-2 → Challaghatta
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
ParkingCar parking Two Wheelers
AccessibleYes Disabled access
Other information
StatusStaffed
Station codeKDNH
History
Opened26 March 2023; 13 months ago (2023-03-26)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Nallurhalli Purple Line Seetharamapalya
towards Challaghatta
Location
Map

Kundalahalli is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. Around this station, holds the SAP Labs India followed by some locations like Fortune Select Trinity Hotel, Ginger Bangalore and many more.[1][2][3]

The Whitefield - Krishnarajapura trial runs were successfully conducted from 25 October for a month.[4] This metro station was inaugurated on March 25 2023 by Prime Minister Narendra Modi and was commenced to the public on March 26 2023.[5][6][7][8][9]

Station layout[edit]

Kundalahalli track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Whitefield (Kadugodi) next station is Nallurhalli
Platform 2
Westbound
Towards ← Challaghatta next station is Seetharamapalya
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit[edit]

There are 2 Entry/Exit points - A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A - Towards SAP Labs India side
  • Entry/Exit point B - Towards Trinity Club Lounge side

See also[edit]

A map shown at the station

References[edit]

  1. ^ Rustagi, Abha (5 May 2022). "Baiyappanahalli-Whitefield Line to be functional from Dec 2022". Metro Rail News. Retrieved 21 June 2022.
  2. ^ "Baiyappanahalli-Whitefield Metro stretch to have 13 stops". The New Indian Express. Retrieved 21 June 2022.
  3. ^ "Namma Metro: Why upcoming Whitefield stretch is a game changer for Bengaluru?". TimesNow. 5 March 2023. Retrieved 5 March 2023.
  4. ^ "Baiyappanahalli-Whitefield metro line trial from October 25". Deccan Herald. 5 October 2022. Retrieved 6 October 2022.
  5. ^ "Metro finally comes to Whitefield, take a ride on March 26 from 7 am!". Deccan Herald. 26 March 2023. Retrieved 26 March 2023.
  6. ^ "Bengaluru Metro: Much awaited metro line between Whitefield to KR Puram to be operational by March". TimesNow. 25 November 2022. Retrieved 28 November 2022.
  7. ^ Bureau, The Hindu (3 February 2023). "Namma Metro train between K.R. Puram and Whitefield to run at frequency of 10 minutes". The Hindu. ISSN 0971-751X. Retrieved 3 February 2023.
  8. ^ "ಮಾರ್ಚ್ 25ಕ್ಕೆ ವೈಟ್‌ಫೀಲ್ಡ್-ಕೆಆರ್ ಪುರಂ ಮೆಟ್ರೋ ಸೇವೆ ಲೋಕಾರ್ಪಣೆ?". Kannadaprabha (in Kannada). Retrieved 14 March 2023.
  9. ^ "BMRCL to zoom metro from KR Puram to Whiefield in 22 minutes". The New Indian Express. Archived from the original on 2 March 2023. Retrieved 2 March 2023.

External links[edit]