Russian corvette MPK-213

From Wikipedia, the free encyclopedia

History
Russia
NameMPK-213
BuilderPeene-Werft, Wolgast
Yard number378
Laid down8 April 1986
Launched28 February 1987
Commissioned29 July 1988
Decommissioned28 May 2004
IdentificationSee Pennant numbers
FateScrapped
General characteristics
Class and typeParchim-class corvette
Displacement
Length72 m (236 ft 3 in)
Beam9.40 m (30 ft 10 in)
Draught4.60 m (15 ft 1 in)
Installed power14,250 hp (10,630 kW)
Propulsion3 shaft M504 diesel engines
Speed24.7 knots (45.7 km/h)
Range2,100 nmi (3,900 km) at 14 knots (26 km/h; 16 mph)
Complement80
Sensors and
processing systems
  • Positive-E, Spin Trough
  • Bass Tilt Hull Mounted Medium Frequency Sonar
Armament
  • 1 × twin 57 mm gun AK-725
  • 1 × twin 30 mm gun AK-230
  • 2 × SA-N-5 MANPAD positions
  • 2 × RBU-6000 anti submarine depth charge rocket launchers
  • 4 × 400 mm torpedo tubes
  • 12 × depth charges

The MPK-213 was a Parchim-class corvette in the Soviet Navy and later Russian Navy.

Specifications[edit]

Developed in the GDR by specialists from the Zelenodolsk shipyard, Captain 2nd Rank O.K. Korobkov was appointed the main observer from the Navy on the project. For the GDR Navy, 16 ships were built (in Germany, Project 133.1, Parchim), the head MPK entered service in 1981. In 1992, all ships of the Project 133.1 were sold to Indonesia. For the USSR Navy, they were built according to the 1331M Project, after the collapse of the USSR, all ships were transferred to the Russian Navy. The modernized version was distinguished by updated artillery, hydroacoustic and radio-technical weapons.[1]

Project 133.1 was developed on the basis of the IPC Project 1124 Albatross in the German Democratic Republic (GDR) with the help of specialists from the Zelenodolsk shipyard for the Navy of the National People's Army of the GDR and the Warsaw Pact countries, as well as for export sales.[2]

Project 1331M was designed in the German Democratic Republic with the technical assistance of the Zelenodolsk Design Bureau for the USSR Navy, this project is a development of Project 133.1 and differs from it in the composition of weapons and navigation equipment.[2]

Construction and career[edit]

MPK-213 was laid down on 8 April 1986 at Peene-Werft, Wolgast. Launched on 28 February 1987 and commissioned on 29 July 1988 into the Baltic Fleet.[3]

The ship was decommissioned on 28 May 2004 and was later scrapped.[4]

Pennant numbers[edit]

Date Pennant number[3]
1988 06
1988 222
1996 226

Citations[edit]

  1. ^ Conway's All the World's Fighting Ships 1947–1995
  2. ^ a b Saunders, Stephen (2009). Jane's Fighting Ships 2009-2010. Jane's Information Group. ISBN 978-0710628886.
  3. ^ a b "Small Anti-Submarine Ships - Project 1331M". russianships.info. Retrieved 19 September 2021.
  4. ^ "МПК-213 – Design 1331, 1331М". fleetphoto.ru. Retrieved 19 September 2021.