HBR Layout metro station

Coordinates: 13°02′02″N 77°37′46″E / 13.03383°N 77.62934°E / 13.03383; 77.62934
From Wikipedia, the free encyclopedia

HBR Layout
Namma Metro station
General information
LocationNH 44, HBR Layout 4th Block, HBR Layout, Bengaluru, Karnataka 560043
Coordinates13°02′02″N 77°37′46″E / 13.03383°N 77.62934°E / 13.03383; 77.62934
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsSide platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2026; 2 years' time (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Kalyan Nagar Blue Line
(Future Service)
Nagawara
Location
Map

HBR Layout is an upcoming elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bangalore, India. Around this metro station comprises the main Hennur Bio-Diversity Park followed by prime locations like VBR PU College, Sun Technology Integrators Pvt. Ltd., Bhima Jewellers, a couple of car company showrooms like Nissan, Mahindra, Hyundai and prime neighbouring areas like Hennur, Lingarajapuram and Outer Ring Road leading towards Hebbal in the north and Kalyan Nagar, Krishnarajapuram and Silk Board in the south. This metro station is stated to become operational around June 2026.[2][3][4][5]

Station Layout[edit]

Station Layout - To Be Confirmed

HBR Layout track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Krishnarajapura / Central Silk Board next station is Kalyan Nagar
Platform #
Northbound
Towards ← KIAL Terminals next station is Nagawara Change at the next station for Pink Line
Side platform | Doors will open on the left Disabled access
L2

See also[edit]

References[edit]

  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.

External links[edit]

  • BMRCL English - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.