Bulamagi–Igayaza–Kakumiro Road

Coordinates: 01°57′19″N 31°09′05″E / 1.95528°N 31.15139°E / 1.95528; 31.15139
From Wikipedia, the free encyclopedia

Bulamagi–Igayaza–Kakumiro Road
Route information
Length26 mi (42 km)
HistoryDesignated in 2018
Expected completion in 2020
Major junctions
North endBulamagi
Major intersectionsIgayaza
South endKakumiro
Location
CountryUganda
Highway system

Bulamagi–Igayaza–Kakumiro Road is a road in the Western Region of Uganda, connecting the town of Bulamagi, in Kakumiro District to the town of Kakumiro, the capital and largest urban center in the district.[1]

Location[edit]

The road starts at Bulamagi, and continues in a general southeasterly direction, through Igayaza, to end at Kakumiro in the oil-rich Albertine Graben, a distance of approximately 42 kilometres (26 mi).[2] The geographical coordinates of this road in the neighborhood of Igayaza, Kakumiro District are: 0°57'19.0"N, 31°09'05.0"E (Latitude:0.955278; Longitude:31.151389).[3]

Upgrading to bitumen[edit]

The government of Uganda has earmarked this road for upgrading through the conversion of the existing gravel road to bitumen surface and the building of bridges, drainage channels, culverts and intersections.[4]

In January 2018, the Uganda National Roads Authority (UNRA), on behalf of the government of Uganda, awarded the renovation contract to China Wuyi Industrial Company (CWIC). The renovation is funded in part, by a $40 million loan provided by the Exim Bank of China.[1] Other credible sources have quoted the combined renovation price for this road and the connecting Buhimba–Nalweyo–Kakindu–Bulamagi Road at US$138 million.[citation needed]

As of April 2018, the contractor was in the pre-construction mobilization phase.[1]

Controversy[edit]

In August 2018, the Uganda's Public Procurement and Disposal of Public Assets Authority (PPDA), halted the procurement of an engineering consultant for this road and for the connecting Buhimba–Nalweyo–Kakindu–Bulamagi Road, citing irregularities in the process. The procurement has to be re-advertised from the start.[5]

See also[edit]

References[edit]

  1. ^ a b c ReportBuyer (6 August 2018). "UNRA: Bulamagi–Igayaza–Kakumiro Road Upgrade: Uganda: Project Profile". ReportBuyer.com. Retrieved 6 August 2018.[permanent dead link]
  2. ^ Globefeed.com (6 August 2018). "Distance between Bulamagi, Uganda and Kakumiro, Uganda". Globefeed.com. Retrieved 6 August 2018.
  3. ^ Google (6 August 2018). "Location of Bulamagi–Igayaza–Kakumiro Road" (Map). Google Maps. Google. Retrieved 6 August 2018.
  4. ^ Musisi, Frederic (2 March 2017). "Uganda Runs To China For UShs2 Trillion Oil Roads". Daily Monitor. Kampala. Retrieved 6 August 2018.
  5. ^ Wesonga, Nelson (2 August 2018). "PPDA Blocks Recruitment of Contractor for Oil Road". Daily Monitor. Kampala. Retrieved 6 August 2018.

External links[edit]

01°57′19″N 31°09′05″E / 1.95528°N 31.15139°E / 1.95528; 31.15139