Mesgi'g Ugju's'n Wind Farm

Coordinates: 48°13′05″N 66°42′26″W / 48.21806°N 66.70722°W / 48.21806; -66.70722
From Wikipedia, the free encyclopedia
Mesgi'g Ugju's'n Wind Farm
Map
CountryCanada
Coordinates48°13′05″N 66°42′26″W / 48.21806°N 66.70722°W / 48.21806; -66.70722
StatusOperational
Construction beganJune 22, 2015
Commission date2017
Construction cost$330,000,000 (2013)
Owner(s)Parc éolien Mesgi'g Ugju's'n (MU) S.E.C
Wind farm
Hub height100 m
Rotor diameter114 m
Rated wind speed12 m/s
Site area25,863 ha
Power generation
Units operational47
Make and modelSenvion 3.2M114[1]
Nameplate capacity149.25 MW
External links
Websitewww.muwindfarm.com

The Mesgi'g Ugju's'n (MU) Wind Farm, "big wind" in Mi'gmaq is a 149.25 megawatt (MW) wind farm currently under construction in eastern Quebec, Canada. The MU wind farm is expected to produce enough electricity to power approximately 30,000 homes.[2] The wind project is owned and developed in a 50-50 partnership between the three Mi’gmaq First Nations (Listuguj, Gesgapegiag, Gespeg[3]) and Innergex Renewable Energy.[4][5]

The wind farm became operational in 2017.

See also[edit]

References[edit]

  1. ^ "A page of history was turned: Quebec's first 3.2M114 wind turbine is built!". Retrieved 2016-06-29.
  2. ^ "Senvion wins 150 Megawatt contract for Canadian wind farm" (PDF). Senvion. Archived from the original (PDF) on 14 July 2015. Retrieved 5 May 2015.
  3. ^ "History Site-Micmac Interpretation Site of Gespeg on BonjourQuebec".
  4. ^ "CHRONICLE 1 - Mesgi'g Ugju's'n" (PDF). innergex.com. Retrieved 4 June 2015.
  5. ^ "Mesgi'g Ugju's'n". Innergex.com. Retrieved 4 June 2015.

External links[edit]